Southmere Phase 1b, London

Icon Prev Icon Next

Southmere Phase 1b, London

Icon Prev Icon Next

Southmere Phase 1b, London

Icon Prev Icon Next

Southmere Phase 1b, London

Icon Prev Icon Next

Southmere Phase 1b, London

Icon Prev Icon Next

Southmere Phase 1b, London

Icon Prev Icon Next
Projects

Southmere Phase 1b

Comprising a total of 404 new homes, commercial space and public realm spaces, Southmere Village Phase 1B will bring to life an area of former economic deprivation. Four Point Architects designed the new build homes with creative brick detailing to elevate the building’s aesthetic. IG Masonry Support provided many of its products to brickwork contractor Landmark Brickwork and main contractor Durkan, to help achieve the architect’s vision.

The Southmere housing development is being built as part of a regeneration project, designed to revitalise the Harrow Manor Way area of South East London. New residences will be mixed tenure units, including both shared ownership and affordable rent units, within a range of attractive tower block and town houses.

IG Masonry Support supplied products for buildings C1, C4 and C5, totaling nine blocks. The entire development is valued at £126m and IG Masonry Support’s product package for this development is the largest the company has supplied to a project since its inception. The introduction of new building regulations set out by Approved Document B meant the brickwork contractor needed to find products which met the conditions. IG Masonry Support’s B.O.S.S.+ (Brick on Soffit System) met these standards, making them the ideal choice of supplier.

 

+ Read more
Project Details

Architect

Four Point Architects

Main Contractor

Durkan

Brickwork Contractor

Landmark Brickwork

Developer

Peabody

Products used

Welded Masonry Support

Masonry Support Corners

Windposts

Cast-in Channel

Specials

Fixings

Brick Slip Lintels

B.O.S.S.+

Brick Slip Arch Lintels

Welded Shims

Brick Cutting Service

Cavity Tray Lintels

Location

Thamesmead, London

Southmere
SouthmerePhase1b_ProjectImage_IGMasonrySupport (6)
Icon Prev Icon Next
Resources
IGMS-Brick-Special-Product-Guide

Brick Special Product Guide (4mb)

Click to download our Brick Special Product Guide

Icon Download Download
Product Brochure

Full Product Brochure (9.6mb)

Click to download our Full Product Brochure

Icon Download Download

“Southmere was a particularly complex build programme. Products were designed, manufactured and delivered by IG Masonry Support to the highest of standards and we were delighted at the dedication shown by their team to ensure all products met our client’s expectations.”

Martin Cockram, Managing Director - Landmark Brickwork

“I would like to thank the whole team for their hard work over the past 14 months. This was a very complicated design package which has been made even harder through a pandemic and meetings being carried out entirely on video calls, well done all.”

Paul Turney, Technical Manager - Durkan

“It’s great to see the hard work round the design team table being delivered to such a high standard on site, providing our client an exceptional building. I echo Paul’s comments and wish to thank him, the Durkan team, Fourpoint, OCSC, Landmark and IG for their hard work and dedication to this project. ”

Russell Murphy, Construction Director - Durkan

Icon Prev Icon Next
Icon

Discuss Your Project

Contact our technical design team to collaborate or enquire about a project.

Contact Us
Projects using these products

55 Victoria Street

Westminster, London

Discover More Icon Arrow
Icon Prev Icon Next
SouthmerePhase1b_FeatureImage_IGMasonrySupport
Projects using these products

Southmere Phase 1b

Thamesmead, London

Discover More Icon Arrow
Icon Prev Icon Next

Icon

Request CPD Presentation

Gain your CPD points by requesting a Continuous Professional Development presentation on IG Masonry Support solutions.

Request CPD