IG’s engineers designed and manufactured a bespoke steel solution for the 12m segmental arch.
The size of the installation determined that the arch would be manufactured in three separate components. The sections were fixed to stub posts on the steel frame of the building also designed and supplied by IG.
The unique Brick Slip Systems were produced offsite in partnership with Fab-Lite Building Solutions Ltd, dramatically reducing the installation time by up to 90%. The bricks selected ensured the advanced Brick Slip solutions provided architectural consistent features, generating reference to the Edwardian surroundings.