At the time of the project, B.O.S.S. A1 had just launched and this was one of the first projects to benefit from this technically advanced soffit solution which was used to create the corbelled units as well as the other brick soffit features across the build. Manufactured offsite, the prefabricated components were delivered to site complete with brick slips adhesively bonded and mechanically secured to the brick carrier unit. B.O.S.S. A1 is 70% lighter than equivalent concrete units, thus facilitating fast and efficient installation, reducing installation times by up to 90%, and negating the need for mechanical lifting.
Additionally, IG Masonry Support provided brick cutting, and supported the brickwork contractor by collecting bricks from site and cutting them before they were bonded to the units. Supplementary brick cutting was also carried out for pistol bricks required onsite which were all carried out within their Brick Cutting Facilities in Overseal, South Derbyshire.
An additional and final benefit to the client was the quoting and design collaboration between IG Masonry Support and sister company Keyfix. IG Masonry Support supplied a full package of B.O.S.S. A1, Masonry Support, and Brick Cutting Services. In addition, Keyfix supplied 3,801 metres of its Non-combustible Cavity Tray (NCCT), 953 metres of its Non-combustible Cavity Tray Lintels, 4,055 preformed Corner Units, and 18,674 weep vents, exceeding and futureproofing the building in accordance with updated building regulations.
The external design team was very accommodating in terms of the level of detail provided from an early stage which greatly helped our companies to minimise variations in costs. Our teams provided full technical support from conception stage, to approval and installation.