The experience and expertise of IG Masonry Support’s technical team was essential to ensuring the 90-degree corner arches’ unique formation complemented the surrounding building work. Following extensive research and detailed assessments, a complex system involving a large volume of steel and brickwork was designed and embedded within the structure’s corner section, thus providing a suitable base for the deep-soffit arches to meet at the correct angle. For the finish, our half-arch solution combined with our innovative B.O.S.S. deep-soffit system, proved ideal.
In terms of the logistical operation to install the two large arches on the building’s fourth level, we required engagement with Nottingham City Council to implement appropriate road closures during their delivery. Due to their size, the arches were delivered separately and once on site, were carefully craned towards the top of the building. This process was particularly challenging, as there was little space (half-metre) for the contractor to install the heavy structures into the correct position.
Thanks to the design skills of our technical team in supplying a solution that was bespoke and precision-made for this application, the corner arches were an identical fit. They provided the impressive building with a unique feature and an aesthetically-pleasing finish. The prefabricated nature of the arches not only guaranteed their controlled and high-quality manufacture, it led to a more rapid and cost-effective installation, with the units being delivered straight to site for immediate implementation. This outcome would not have been possible with traditional brickwork and might have delayed The Island Quarter’s scheduled and much-anticipated opening in late 2022.
Read more details and view technical drawings in our case study brochure.